Below are some pictures of the multiple layers of the liner being installed.

For further information on what the layers are, click here.

For information on the Coldwater Springs flow rates click here.
(pumping at the interchange during construction is temporarily reducing water flow.)
 
 
 

prepareing the base for the liner

installing layer one

Installing layer 2